• About
  • Advertise
  • Subscribe
  • Contact
  • List Stock
Sunday, January 25, 2026
Newsletter
SUBSCRIBE
MARKETPLACE
  • Latest News
  • Features
    • Sustainability
    • Diversity
    • Community Support
    • Technology Update
    • Traffic Management and Safety
  • Contracts and tenders awarded
  • Regions
    • ACT
    • Australia
    • New South Wales
    • Northern Territory
    • Queensland
    • South Australia
    • Tasmania
    • Victoria
    • Western Australia
  • Events
  • Resources
No Results
View All Results
  • Latest News
  • Features
    • Sustainability
    • Diversity
    • Community Support
    • Technology Update
    • Traffic Management and Safety
  • Contracts and tenders awarded
  • Regions
    • ACT
    • Australia
    • New South Wales
    • Northern Territory
    • Queensland
    • South Australia
    • Tasmania
    • Victoria
    • Western Australia
  • Events
  • Resources
No Results
View All Results
Home support

Bentley Systems now features life cycle assessment and embodied carbon calculation capabilities for infrastructure digital twins

by Staff Writer
March 11, 2022
in Environment, Latest News, Technology Update
Reading Time: 6 mins read
A A
Exporting quantities to One Click LCA from an infrastructure digital twin (via the Bentley iTwin platform).

Exporting quantities to One Click LCA from an infrastructure digital twin (via the Bentley iTwin platform).

Share on FacebookShare on Twitter
Exporting quantities to One Click LCA from an infrastructure digital twin (via the Bentley iTwin platform).

Infrastructure engineering software company Bentley Systems has announced the availability of integrated workflows for lifecycle assessment (LCA) and embodied carbon calculation capabilities in the Bentley iTwin platform to support the sustainable-development goals of infrastructure projects.

This integration is a result of Bentley’s collaboration with One Click LCA construction sector lifecycle assessment and environmental product declaration software. The software can be used for buildings, infrastructure, renovations, construction products and materials, and portfolios. The One Click LCA platform is used in over 100 countries by manufacturers, consultants, designers, contractors, and investors to decarbonise the entire construction value chain.

The partnership is a natural step in Bentley’s strategy for empowering its users to achieve sustainable development goals (SDGs), particularly addressing climate action and decarbonising infrastructure. Infrastructure digital twin solutions will be an essential enabler and accelerator of carbon transparency and disclosure use cases, and the adoption of digital twin solutions will help accelerate the transformation of infrastructure performance.

With this integration, Bentley’s infrastructure digital twin solutions powered by iTwin, and third-party applications built on the Bentley iTwin platform can unlock infrastructure lifecycle assessment workflows. The Bentley iTwin platform is an open, scalable, platform-as-a-service offering enabling an ecosystem of developers to create and bring to market solutions that solve real infrastructure problems by leveraging digital twins.

“We are excited to see developers in the Bentley iTwin platform ecosystem tackling sustainability and carbon reduction challenges,” Kaustubh Page, Director of Product Management, Bentley iTwin platform, said. “Tracking the environmental impact of an infrastructure project involves a constant stream of design changes coming from various engineering disciplines. By unifying these data streams, users can quickly create a quantity takeoff report at the right aggregation level required for LCA calculations while reducing the lifecycle assessment workflow from weeks to hours. We are excited to see engineering firms build fully automated lifecycle assessment workflows for their infrastructure projects.”

Designers and sustainability engineers spend a significant amount of time assessing or reporting on the environmental footprint of infrastructure projects. With multiple design tools used in these projects, a typical lifecycle analysis can be time consuming, especially when manually exporting and aggregating data from bills of quantity and bills of material. It can also be error-prone, requiring additional verification of successful ingestion by LCA tools.

One Click LCA Carbon Report obtained from the quantities exported via the Bentley iTwin platform.

The One Click LCA integration creates time savings and improves accuracy. Users can incorporate engineering data created by diverse design tools into a single view using the Bentley iTwin platform, generate a unified report of materials and quantities and share it with One Click LCA via cloud synchronisation. This integration gives users the ability to analyse environmental footprints, accelerate environmental reporting, perform project optioneering, and optimise the selection of materials and products.

“Infrastructure engineers are at the forefront of disrupting climate change. And our collective conscious is that climate change and its effects won’t be solved without strong collaboration and ecosystem partnerships. One Click LCA can actively contribute by helping our users accelerate their low-carbon pathways—adopting low-carbon materials and products, minimising resource consumption, and optimising structural design—in every type of infrastructure, not just vertical infrastructure,” Rodrigo Fernandes, director ES(D)G (empowering sustainable development goals), said.

With the ability to integrate lifecycle assessment workflows with the Bentley iTwin platform, users will be empowered with new opportunities for environmental intelligence around embodied carbon and environmental footprints of linear infrastructure projects.

Panu Pasanen, CEO, One Click LCA, said the company was pleased to work with Bentley Systems to automate carbon accounting and reduction using the Bentley iTwin platform.

“Bentley’s focus in civil engineering and infrastructure with this integration make automated lifecycle assessment finally a reality also for public works. This partnership allows infrastructure designers and contractors, as well as contracting authorities anywhere in the world, to coordinate, calculate, and reduce carbon, as well as other environmental impacts of their projects. The speed and ease of the automation will also be greatly appreciated by projects pursuing third-party environmental certifications, such as PAS 2080, CEEQUAL, Envision, LEED, and BREEAM or regulatory tools. We keep working with Bentley to develop further innovations in this space, such as circularity assessment tools.”

Kelvin Saldanha, associate at WSP, said iTwin had quickly become an indispensable platform on some of the company’s largest projects.

“It has made our federated models even more accessible and has brought a new simplicity to multidisciplinary coordination, making for more robust design reviews, conflict detection, and issue resolution. The integration between iTwin and One Click LCA is a potential game-changer in offering unprecedented efficiency to our carbon calculation and lifecycle analysis workflows. We are so excited to see iTwin services continue to evolve and are keen to see how this will bring us another step closer to realising WSP’s Net Zero ambitions,”  he said.

About the Bentley iTwin Platform

The Bentley iTwin platform is an open, scalable cloud platform that enables project teams and owner-operators to create, visualise, and analyse digital twins of infrastructure assets. It enables digital information managers to incorporate engineering data created by diverse design tools into a living digital twin and align it with reality data, and other associated data without disrupting their current tools or processes. Users are able to visualise and track changes including changes in real world conditions from IoT connected devices, such as sensors and drones. The Bentley iTwin platform facilitates actionable insights for decision makers across the organisation and asset lifecycle. Users make better-informed decisions, anticipate and avoid issues before they arise, and react more quickly with confidence, resulting in cost savings, improved service availability, lower environmental impact, and improved safety. The Bentley iTwin platform is the foundation for applications powered by iTwin and digital twin solutions created by Bentley and its strategic partners, digital integrators, system integrators, independent software vendors, and software developers.

 

About Bentley Systems

Bentley Systems (Nasdaq: BSY) is the infrastructure engineering software company. We provide innovative software to advance the world’s infrastructure – sustaining both the global economy and environment. Our industry-leading software solutions are used by professionals, and organisations of every size, for the design, construction, and operations of roads and bridges, rail and transit, water and wastewater, public works and utilities, buildings and campuses, mining, and industrial facilities. Our offerings include MicroStation-based applications for modelling and simulation, ProjectWise for project delivery, AssetWise for asset and network performance, Seequent’s leading geoprofessional software portfolio, and the iTwin platform for infrastructure digital twins. Bentley Systems employs more than 4,500 colleagues and generates annual revenues of approximately $1 billion in 186 countries.

www.bentley.com


Related stories:

  • Bentley Systems wins ‘Company of the Year’ at 2021 Construction Computing Awards
  • Bentley Systems’ Seequent acquires new geostatistical software
  • Bentley Systems enters grid structure design with $US700M acquisition
Tags: Bentley Systemscivil engineeringclimate changedigital twinDigital TwinsEmbodied CarboninfrastructureiTwinlifecycle assessmentOne Click LCAWSP
24

$69,000

2016 VOLVO PF2181

  • » Listing Type: Used
Location marker The shape of a location marker

Cranbourne North, VIC

0485 931 103
MORE DETAILS
23

$104,500

2017 CATERPILLAR AP300FLRC

  • » Listing Type: Used
Location marker The shape of a location marker

Acacia Ridge, QLD

07 3171 1725
MORE DETAILS
28

$192,500

2017 CATERPILLAR AP355FLRC

  • » Listing Type: Used
Location marker The shape of a location marker

Acacia Ridge, QLD

07 3171 1725
MORE DETAILS
6

$304,220

2008 TEREX CR662RM

  • » Listing Type: Used
  • » Category: Crawler
Location marker The shape of a location marker

Acacia Ridge, QLD

07 3073 8184
MORE DETAILS
24

$270,435

LEEBOY PF161B

  • » Listing Type: Used
  • » Category: Tyred
  • » Max paving width - mm: 3,200
Location marker The shape of a location marker

Acacia Ridge, QLD

07 3073 8184
MORE DETAILS
12

$202,400

2011 DYNAPAC F1000W

  • » Listing Type: Used
  • » Category: Tyred
  • » Max paving width - mm: 7,925
Location marker The shape of a location marker

Acacia Ridge, QLD

07 3073 8184
MORE DETAILS
12

$143,000

LEEBOY 1200S ASPHALT MAINTAINER

  • » Listing Type: Used
  • » Category: Tyred
  • » Max paving width - mm: 1,600
Location marker The shape of a location marker

Acacia Ridge, QLD

07 3073 8184
MORE DETAILS
13

$507,650

2011 TEREX CR452RX

  • » Listing Type: Used
  • » Category: Tyred
  • » Max paving width - mm: 8,500
Location marker The shape of a location marker

Acacia Ridge, QLD

07 3073 8184
MORE DETAILS
9

$159,150

LEEBOY 5000 PATH MASTER PAVER

  • » Listing Type: New
  • » Category: Crawler
  • » Max paving width - mm: 2,720
Location marker The shape of a location marker

Acacia Ridge, QLD

07 3073 8184
MORE DETAILS
4

$8,000

1974 BLAW-KNOX BK-20

  • » Listing Type: Used
  • » Category: Tyred
  • » Max paving width - mm: 2,440
Location marker The shape of a location marker

Eltham, VIC

03 8373 7151
MORE DETAILS
8

$105,000

2007 BLAW-KNOX PF150

  • » Listing Type: Used
  • » Category: Tyred
Location marker The shape of a location marker

Acacia Ridge, QLD

07 3073 8184
MORE DETAILS
5

$110,000

2007 BLAW-KNOX PF150

  • » Listing Type: Used
  • » Category: Tyred
Location marker The shape of a location marker

Acacia Ridge, QLD

07 3073 8184
MORE DETAILS

Related Posts

Construction has commenced on a new replacement bridge for Rainbow Creek, which flows through Cowwarr and Heyfield in regional Victoria.

Works underway on replacement Rainbow Creek Bridge

by Tom O'Keane
January 23, 2026

Construction has commenced on a new replacement bridge for Rainbow Creek, which flows through Cowwarr and Heyfield in regional Victoria....

Over 280 roads will receive funding for upgrades under the 2025-26 Black Spot Program, an annual works package supported by the Federal Government.

More than 280 roads set for upgrades

by Tom O'Keane
January 23, 2026

Over 280 roads will receive funding for upgrades under the 2025-26 Black Spot Program, an annual works package supported by...

The contract for works to deliver the $83.5 million Ballan Road intersection upgrade in Melbourne’s west has been awarded, with the project aiming to improve traffic flow, ease congestion, and make it safer to drive, walk and cycle through the surrounding region.

Two major VIC road intersection projects underway

by Sean Gustini
January 22, 2026

The Victorian Government is moving forward on two critical road intersection projects, with a new contract awarded, and separate works...

Join our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.

Catering to Australia’s civil and road construction industry, Roads & Infrastructure Magazine is a key source for industry decision-makers looking to keep up to date with important issues, developments, projects and innovations shaping the industry today.

Subscribe to our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.

About Roads And Infrastructure

  • About
  • Advertise
  • Subscribe
  • Contact
  • Latest Magazine
  • Terms & Conditions
  • Privacy Collection Notice
  • Privacy Policy

Popular Topics

  • Latest News
  • Contracts and tenders awarded
  • Project Report
  • Events
  • Special Features

Our TraderAds Network

  • Arbor Age
  • Australian Car Mechanic
  • Australian Mining
  • Australian Resources & Investment
  • Big Rigs
  • Bulk Handling Review
  • Bus News
  • Cranes & Lifting
  • Earthmoving Equipment Magazine
  • EcoGeneration
  • Energy Today
  • Food & Beverage
  • Fully Loaded
  • Global Trailer
  • Inside Construction
  • Inside Waste
  • Inside Water
  • Landscape Contractor Magazine
  • Manufacturers' Monthly
  • MHD Supply Chain
  • National Collision Repairer
  • OwnerDriver
  • Power Torque
  • Prime Mover Magazine
  • Quarry
  • Roads Online
  • Rail Express
  • Safe To Work
  • The Australian Pipeliner
  • Trade Earthmovers
  • Trade Farm Machinery
  • Trade Plant Equipment
  • Trade Trucks
  • Trade Unique Cars
  • Tradie Magazine
  • Trailer Magazine
  • Trenchless Australasia
  • Waste Management Review

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited

No Results
View All Results
NEWSLETTER
SUBSCRIBE
MARKETPLACE
  • News
    • Latest News
    • Contracts and tenders awarded
    • Project Report
  • Features
    • Sustainability
    • Diversity
    • Community Support
    • Technology Update
    • Traffic Management and Safety
  • Events
  • Regions
    • ACT
    • Australia
    • New South Wales
    • Northern Territory
    • Queensland
    • South Australia
    • Tasmania
    • Victoria
    • Western Australia
  • Latest Magazine
  • Resources
  • Marketplace
  • About Us
  • Advertise
  • Subscribe
  • Contact Us
  • List Stock

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited