• About
  • Advertise
  • Subscribe
  • Contact
  • List Stock
Tuesday, December 16, 2025
Newsletter
SUBSCRIBE
MARKETPLACE
  • Latest News
  • Features
    • Sustainability
    • Diversity
    • Community Support
    • Technology Update
    • Traffic Management and Safety
  • Contracts and tenders awarded
  • Regions
    • ACT
    • Australia
    • New South Wales
    • Northern Territory
    • Queensland
    • South Australia
    • Tasmania
    • Victoria
    • Western Australia
  • Events
  • Resources
No Results
View All Results
  • Latest News
  • Features
    • Sustainability
    • Diversity
    • Community Support
    • Technology Update
    • Traffic Management and Safety
  • Contracts and tenders awarded
  • Regions
    • ACT
    • Australia
    • New South Wales
    • Northern Territory
    • Queensland
    • South Australia
    • Tasmania
    • Victoria
    • Western Australia
  • Events
  • Resources
No Results
View All Results
Home Industry News

Revizto: Creating a digital hub

by Tom O'Keane
December 2, 2025
in Industry News, Latest News, Technology Update
Reading Time: 7 mins read
A A
Revizto was used by the joint venture delivering the Warringah Freeway Upgrade, one of the largest projects in New South Wales. Image: Arcadis.

Revizto was used by the joint venture delivering the Warringah Freeway Upgrade, one of the largest projects in New South Wales. Image: Arcadis.

Share on FacebookShare on Twitter

Arcadis’ recent and ongoing works on the Warringah Freeway Upgrade have been greatly assisted by Revizto, a platform that’s assisted in the delivery of what is one of Australia’s most complex and major infrastructure packages for an essential connection.

Even for a global design and consultancy firm of Arcadis’ scale, there’s always room for improvement and growth.

It’s this very belief and vision that’s led to the company maintaining a global presence in more than 70 countries, while playing a key role in delivering some of Australia’s most significant infrastructure projects to date, and into the future.

Included in this portfolio is the Warringah Freeway Upgrade, which is seeing Arcadis work with several major industry partners to deliver improved infrastructure for one of New South Wales’s essential arterial connections.

The Warringah Freeway is a major connection that links the Sydney Harbour Tunnel to the Gore Hill Freeway and ranks as the eighth busiest road in the state. It’s also one of the top 30 most congested road corridors in the nation.

To cater for future traffic demand, spurred on in part by an increase in traffic volume that will come with the future Western Harbour Tunnel, an upgrade is being delivered to take the pressure off the Sydney Harbour Bridge, Sydney Harbour Tunnel and Anzac Bridge. 

As part of a joint venture with Jacobs and CPB, Arcadis is helping to deliver improvements to four grade separated interchanges, upgrades to 10 bridges and the establishment of 7.2 kilometres of retaining walls.

During an internal examination, Arcadis assessed its array of construction and digital delivery software, used for its vast variety of ongoing projects in the transport, electric vehicle infrastructure, estates, precincts and energy spaces, among others.

At the head of this assessment was Mitch Medway, Global Digital Engineering Director, Arcadis.

“Arcadis’ journey with Revizto started back in late 2021,” he says. “I joined Arcadis back in 2019 and one of the things that we identified was where we had gaps in our technological ecosystem.

“We didn’t really have a solution that would enable us to do sophisticated model coordination and assign issues back to people who were accountable for fixing those issues. Tools existed, but some of them just didn’t have what we needed, especially when we’re talking about tackling infrastructure projects at scale.”

Arcadis’ decision to adopt a new platform was also driven by a desire for clean workflows, interoperability with all of its tools, and an intuitive platform for both its own teams and joint venture partners.

All of which were an essential requirement before the commencement of works on one of the key infrastructure projects that now form part of Arcadis’ project portfolio.

“One of those key projects at the time of our initial adoption of Revizto was the Warringah Freeway Upgrade in Sydney,” Medway says.

In addition to Arcadis, each of the partners within the joint venture were existing Revizto users, helping to further streamline design and collaboration throughout the delivery of the project.

“We were fortunate that Revizto was already a known application with the stakeholders that were working on these projects. We weren’t just going in with a shiny new toy, it was already proven,” Medway says.  “We’ve always said that we should definitely look to invest in not just what we believe, but where our clients do as well, because that alignment can, at times, be part of the criteria when it comes to actually picking teams and winning more work.”


 

Related stories:

  • Revizto empowering teams on the go
  • Building a digital legacy: AECOM and Revizto
  • How Arcadis improved their digital collaboration with Revizto

 


Built on a gaming engine, Revizto provides a single source of truth through a highly accessible and flexible BIM (Building Information modelling) platform.

Revizto transforms how AECO (Architecture, Engineering, Construction, and Operations) teams work by bringing the entire project and project team into one collaborative hub, to visualise, review and verify projects across the full life cycle.

Therefore, enabling faster decisions, reduced risk, and greater control by providing a user-friendly interface, ease-of-use, and fast onboarding for non-BIM skilled teams.

Architects, engineers, contractors, and owners can be all connected on one model, to assess both three- and two-dimensional spaces to identify potential clashes.

Beyond providing accurate, critical and detailed modelling and information, the collaborative nature of the platform continues to be a standout quality throughout the project lifecycle thus far, as Medway explains.

The Revizto platform allows project stakeholders to conduct clash-detection, while also establishing a digital hub for changes and progress updates.
The Revizto platform allows project stakeholders to conduct clash-detection, while also establishing a digital hub for changes and progress updates.

“Revizto wasn’t just a design tool, it was a legitimate collaboration tool, and regardless of your role or the type of stakeholder that you were, that data was and is accessible to everyone,” he says.

“Just one example is the issue tracker inside of Revizto. Revizto collects the clash detection data, a process that can be automated to push into the issue tracker, which is more or less your repository or historical record of all issues that occur on the project. There we can search and retrieve that information, so can a project manager or anyone else involved in the project, who can access a visualisation of that data in clean form.”

The effectiveness of the tool also “greatly” aided communication between different disciplines.

“Those clean workflows are so important,” Medway says. “If I’m a structural engineer and I need to send information really quickly to a civil engineer on what is a complex interface, Revizto can synchronise that information, regardless of the authoring platform, into one common area.

“If there’s alterations needed, that could take no more than five seconds for the model to be updated. That communication and those changes can happen in what is almost real-time.”

It’s this ‘single source of truth’ that’s helped Arcadis – within the joint venture – to establish a centralised hub, driven by the expertise of each project partner, as well as a desire to deliver the best possible project outcome for the community.

“It’s invaluable to work within a collaborative digital hub, with every piece of information, point clouds, models, drawings and more in one spot,” Medway says. “Not only that, but also every person that’s working on the project.

“It’s always been about the whole project lifecycle. Having all that information in one hub is how we can enable the speed and efficiency required to de-risk these major projects.”

This article was originally published in the November edition of our magazine. To read the magazine, click here.

View site equipment for sale and enhance infrastructure projects.
20

$400

1991 HOEFLON TC-1

  • » Listing Type: Used
Location marker The shape of a location marker

Seven Hills, NSW

02 8315 3992
MORE DETAILS
20

$715

2022 GMV WINLET 575

  • » Listing Type: Used
Location marker The shape of a location marker

Seven Hills, NSW

02 8315 3992
MORE DETAILS
32

$1,045

GMV WINLET 1000 - 1T GLASS HANDLING MACHINE - IN STOCK NOW

  • » Listing Type: Used
Location marker The shape of a location marker

Seven Hills, NSW

02 8315 3992
MORE DETAILS
10

$4,400

TRAILER MOUNTED TOILET JIMBOOMBA TRAILER & PORTALOO

  • » Listing Type: Used
Location marker The shape of a location marker

Edmonton, QLD

07 3073 8338
MORE DETAILS
13

$30,000

AUSCO MSA-0119

  • » Listing Type: Used
Location marker The shape of a location marker

Dalby, QLD

07 3171 1722
MORE DETAILS
6

$4,500

HYDRAULIC ROCK BREAKER HAMMER 70MM DIAMETER DRILL BIT

  • » Listing Type: Used
Location marker The shape of a location marker

Broadmeadows, VIC

03 8373 7337
MORE DETAILS
11

$95,500

2024 TRIMBLE X9 SCANNER

  • » Listing Type: Used
Location marker The shape of a location marker
Please check description for location
07 3171 1050
MORE DETAILS
10

$44,000

CATERPILLAR 242B SKID STEER LOADER 2019

  • » Listing Type: Used
Location marker The shape of a location marker

Broadmeadows, VIC

03 8373 7337
MORE DETAILS
32

$145,000

2023 GMV WINLET 1000 - 1T GLASS HANDLING MACHINE - IN STOCK NOW

  • » Listing Type: New
Location marker The shape of a location marker

Seven Hills, NSW

02 8315 3992
MORE DETAILS
12

$29,900

2024 HOEFLON S800 GLASS SUCKER - 800KG CAPACITY

  • » Listing Type: New
Location marker The shape of a location marker

Seven Hills, NSW

02 8315 3992
MORE DETAILS
7

$3,000

STAINLESS STEEL INSTALLATION ACCESS PLATFORM STEPS 5 STEPS

  • » Listing Type: Used
Location marker The shape of a location marker

Broadmeadows, VIC

03 8373 7337
MORE DETAILS
6

$1,500

INSTALLATION ACCESS PLATFORM STEPS 3 STEPS

  • » Listing Type: Used
Location marker The shape of a location marker

Broadmeadows, VIC

03 8373 7337
MORE DETAILS

Related Posts

Caterpillar has a variety of services, aimed at providing optimal support for its customers in the short and long term. Images: CAT.

CAT: Value agreements benefitting business

by Tom O'Keane
December 16, 2025

Equipment that continues to deliver value over the long term is one of the key pillars of productive operations, paving...

The Western Australian Government has announced an additional $80 million in road safety funding, which will aim to further prevent dangerous driving in local communities.

WA road safety package announced

by Tom O'Keane
December 16, 2025

The Western Australian Government has announced an additional $80 million in road safety funding, which will aim to further prevent...

The conference space hosted a variety of key discussions and forums, all focused on tackling industry issues. Images: National Precast.

Recycling the road ahead

by Tom O'Keane
December 15, 2025

This year marked a major milestone for AustStab, as the Association celebrated 30 years at the forefront of pavement recycling...

Join our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.

Catering to Australia’s civil and road construction industry, Roads & Infrastructure Magazine is a key source for industry decision-makers looking to keep up to date with important issues, developments, projects and innovations shaping the industry today.

Subscribe to our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.

About Roads And Infrastructure

  • About
  • Advertise
  • Subscribe
  • Contact
  • Latest Magazine
  • Terms & Conditions
  • Privacy Collection Notice
  • Privacy Policy

Popular Topics

  • Latest News
  • Contracts and tenders awarded
  • Project Report
  • Events
  • Special Features

Our TraderAds Network

  • Arbor Age
  • Australian Car Mechanic
  • Australian Mining
  • Australian Resources & Investment
  • Big Rigs
  • Bulk Handling Review
  • Bus News
  • Cranes & Lifting
  • Earthmoving Equipment Magazine
  • EcoGeneration
  • Energy Today
  • Food & Beverage
  • Fully Loaded
  • Global Trailer
  • Inside Construction
  • Inside Waste
  • Inside Water
  • Landscape Contractor Magazine
  • Manufacturers' Monthly
  • MHD Supply Chain
  • National Collision Repairer
  • OwnerDriver
  • Power Torque
  • Prime Mover Magazine
  • Quarry
  • Roads Online
  • Rail Express
  • Safe To Work
  • The Australian Pipeliner
  • Trade Earthmovers
  • Trade Farm Machinery
  • Trade Plant Equipment
  • Trade Trucks
  • Trade Unique Cars
  • Tradie Magazine
  • Trailer Magazine
  • Trenchless Australasia
  • Waste Management Review

© 2025 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited

No Results
View All Results
NEWSLETTER
SUBSCRIBE
MARKETPLACE
  • News
    • Latest News
    • Contracts and tenders awarded
    • Project Report
  • Features
    • Sustainability
    • Diversity
    • Community Support
    • Technology Update
    • Traffic Management and Safety
  • Events
  • Regions
    • ACT
    • Australia
    • New South Wales
    • Northern Territory
    • Queensland
    • South Australia
    • Tasmania
    • Victoria
    • Western Australia
  • Latest Magazine
  • Resources
  • Marketplace
  • About Us
  • Advertise
  • Subscribe
  • Contact Us
  • List Stock

© 2025 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited