• About
  • Advertise
  • Subscribe
  • Contact
  • List Stock
Sunday, May 18, 2025
Newsletter
SUBSCRIBE
MARKETPLACE
  • Latest News
  • Features
    • Sustainability
    • Diversity
    • Community Support
    • Technology Update
    • Traffic Management and Safety
  • Contracts and tenders awarded
  • Regions
    • ACT
    • Australia
    • New South Wales
    • Northern Territory
    • Queensland
    • South Australia
    • Tasmania
    • Victoria
    • Western Australia
  • Events
  • Resources
No Results
View All Results
  • Latest News
  • Features
    • Sustainability
    • Diversity
    • Community Support
    • Technology Update
    • Traffic Management and Safety
  • Contracts and tenders awarded
  • Regions
    • ACT
    • Australia
    • New South Wales
    • Northern Territory
    • Queensland
    • South Australia
    • Tasmania
    • Victoria
    • Western Australia
  • Events
  • Resources
No Results
View All Results
Home Latest News

Sustainable urban mobility

by Tom O'Keane
April 25, 2025
in Industry News, Latest News, Rail infrastructure
Reading Time: 5 mins read
A A
The National Precast Association Australia believes the use of precast in upgrades to Sydney Metro Station set the bar for sustainable construction. Image: National Precast.

The National Precast Association Australia believes the use of precast in upgrades to Sydney Metro Station set the bar for sustainable construction. Image: National Precast.

Share on FacebookShare on Twitter

Sydney’s commitment to a greener future has been powerfully demonstrated through the use of innovative precast concrete solutions in upgrades to the Sydney Metro Station, a project that has reshaped the iconic T3 Bankstown Line.

This transformative initiative not only elevates urban mobility but also champions sustainability in public transport, setting new benchmarks for environmentally responsible infrastructure.

At the heart of this modernisation is Dulwich Hill Station, a flagship example of how historical legacy and contemporary design can coexist. The station upgrade introduces cutting-edge features designed to enhance efficiency and reduce the carbon footprint of daily commutes.

With air-conditioned metro trains now scheduled to arrive every four minutes during peak times – delivering up to 15 trains per hour – the revamped station encourages the shift from private vehicles to public transport, ultimately lowering overall greenhouse gas emissions.

By improving service frequency and accessibility, the project plays a key role in decreasing traffic congestion and promoting a more sustainable urban environment. Enhanced facilities, such as new lifts, level access between platforms and trains and state-of-the-art platform screen doors ensure that every journey is safe, efficient and environmentally friendly.

The works wereexecuted under live
rail conditions, requiring meticulous planning.
The works were executed under live
rail conditions, requiring meticulous planning.

Sustainable engineering in practice

The project’s sustainability credentials are further enhanced through the strategic use of precast elements that have been manufactured by National Precast member Ozcast.

This includes products such as transfloor slabs, precast slabs, stairs, culverts and footings, which were selected for their durability, efficiency and minimal environmental impact.

According to National Precast CEO Sarah Bachmann, using precast provides economic, social and environmental benefits that make it the first choice for future-proofing the built environment.

“Precast concrete is a low-waste, high-efficiency solution that reduces the environmental footprint of infrastructure projects,” she says.

“Compared to traditional in-situ construction methods, using precast minimises on-site waste by manufacturing offsite in controlled environments, reduces embodied carbon by optimising material use while also reducing energy consumption, and improves durability, leading to lower maintenance requirements and longer asset lifespans.”


 

Related stories:

  • Feedback received from hundreds for SRL East development
  • $68M to modernise Moss Vale Station
  • New Seymour-Avenel Road bridge now open

 


Using precast also enables faster project delivery, reducing labour costs and time required on site. Additionally, because precast structures are durable and require less maintenance and fewer repairs, it has a lower lifecycle cost. Beyond cost and carbon, precast infrastructure delivers real benefits to communities.

Precasting improves worker safety with manufacturing taking place in a controlled factory environment, resulting in fewer site disruptions and reduced exposure to hazards.

Urban improvements are delivered much quicker, enhancing accessibility and liveability in less time, on top of the infrastructure components being resilient by withstanding extreme weather conditions and reducing long-term environmental impact.

Environmental stewardship in practice

Downer EDI Works, the contractor responsible for the upgrade, executed the project under live rail conditions, with meticulous planning. Every element was delivered and installed to exacting standards, minimising disruption while maximising efficiency and sustainability.

Using precast as a construction method improves worker safety with manufacturing taking place in a controlled factory environment, reducing exposure to hazards.
Using precast as a construction method improves worker safety with manufacturing taking place in a controlled factory environment, reducing exposure to hazards.

Such a rigorous approach requires reliability of supply and reflects a broader commitment to environmental stewardship in the construction industry.

A blueprint for sustainable regeneration

The Sydney Metro Station upgrades offer a forward-thinking model for sustainable urban regeneration. By reducing travel times to key destinations such as Central, Pitt Street, Barangaroo, Victoria Cross and Chatswood, the project not only enhances commuter convenience, but also supports a reduction in energy use and carbon emissions across the network.

This integration of modern engineering with sustainable practices illustrates that preserving historical infrastructure and innovating for the future are not mutually exclusive. Instead, they are complementary forces that drive the evolution of a more resilient, accessible and eco-friendly public transport system.

Bachmann says that if governments and developers are serious about sustainability, efficiency and resilience, precast concrete must be a priority in infrastructure planning.

“By choosing precast solutions from industry leaders such as Ozcast, developers and government bodies can achieve faster construction timelines, superior quality control and reduced environmental impact, aligning with the growing demand for sustainable development in Australia’s construction sector,” she says.

“The Sydney Metro Station upgrades are a blueprint for the future – proving that sustainable infrastructure isn’t just a concept, but is a reality.”

This article was originally published in the April edition of our magazine. To read the magazine, click here.

18

$214,500

2017 CATERPILLAR AP355FLRC

  • » Listing Type: Used
Location marker The shape of a location marker

Acacia Ridge, QLD

07 3171 1725
MORE DETAILS
20

$115,500

2018 CATERPILLAR AP600FLRC

  • » Listing Type: Used
Location marker The shape of a location marker

Acacia Ridge, QLD

07 3171 1725
MORE DETAILS
8

$104,500

2011 CATERPILLAR AP-300

  • » Listing Type: Used
Location marker The shape of a location marker

South Guildford, WA

08 6500 0978
MORE DETAILS
12

$192,500

2021 CATERPILLAR AP300FLRC

  • » Listing Type: Used
Location marker The shape of a location marker

Acacia Ridge, QLD

07 3171 1725
MORE DETAILS
5

$110,000

2007 BLAW-KNOX PF150

  • » Listing Type: Used
  • » Category: Tyred
Location marker The shape of a location marker

Acacia Ridge, QLD

07 3073 8184
MORE DETAILS
4

$8,000

1974 BLAW-KNOX BK-20

  • » Listing Type: Used
  • » Category: Tyred
  • » Max paving width - mm: 2,440
Location marker The shape of a location marker

Eltham, VIC

03 8373 7151
MORE DETAILS
11

$353,650

2011 TEREX CR352RX

  • » Listing Type: Used
  • » Category: Tyred
  • » Max paving width - mm: 6,100
Location marker The shape of a location marker

Acacia Ridge, QLD

07 3073 8184
MORE DETAILS
6

$304,220

2008 TEREX CR662RM

  • » Listing Type: Used
  • » Category: Crawler
Location marker The shape of a location marker

Acacia Ridge, QLD

07 3073 8184
MORE DETAILS
12

$143,000

LEEBOY 1200S ASPHALT MAINTAINER

  • » Listing Type: Used
  • » Category: Tyred
  • » Max paving width - mm: 1,600
Location marker The shape of a location marker

Acacia Ridge, QLD

07 3073 8184
MORE DETAILS
1

$15,000

BLAW-KNOX BK 170

  • » Listing Type: Used
  • » Category: Tyred
  • » Max paving width - mm: 1,370
Location marker The shape of a location marker

Eltham, VIC

03 8373 7151
MORE DETAILS
8

$105,000

2007 BLAW-KNOX PF150

  • » Listing Type: Used
  • » Category: Tyred
Location marker The shape of a location marker

Acacia Ridge, QLD

07 3073 8184
MORE DETAILS
24

$270,435

LEEBOY PF161B

  • » Listing Type: Used
  • » Category: Tyred
  • » Max paving width - mm: 3,200
Location marker The shape of a location marker

Acacia Ridge, QLD

07 3073 8184
MORE DETAILS

Related Posts

The South Australian Government is once again rolling out the Prevent Alcohol and Risk-Related Trauma in Youth (P.A.R.T.Y.) Program, designed to get high school students thinking about the consequences of risky decision-making.

SA road safety program helping to educate school students

by Tom O'Keane
May 16, 2025

The South Australian Government is once again rolling out the Prevent Alcohol and Risk-Related Trauma in Youth (P.A.R.T.Y.) Program, designed...

BA Road Services is proud of its professional relationship with the Wirtgen Group. Images: BA Roads Services

Wirtgen: Values driving quality

by Tom O'Keane
May 16, 2025

BA Road Services, through the use of Wirtgen Group machinery, is setting the standard for culture, sustainability and opportunity in...

Melton level crossing

Two week blitz to begin as part of level crossing removal at Melton

by Jennifer Pittorino
May 16, 2025

Work is progressing on the Level Crossing Removal Project in Melton as crews prepare for a two-week construction blitz. The...

Join our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.
Catering to Australia’s civil and road construction industry, Roads & Infrastructure Magazine is a key source for industry decision-makers looking to keep up to date with important issues, developments, projects and innovations shaping the industry today.

Subscribe to our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.

About Roads And Infrastructure

  • About
  • Advertise
  • Subscribe
  • Contact
  • Latest Magazine
  • Terms & Conditions
  • Privacy Collection Notice
  • Privacy Policy

Popular Topics

  • Latest News
  • Contracts and tenders awarded
  • Project Report
  • Events
  • Special Features

Our TraderAds Network

  • Arbor Age
  • Australian Car Mechanic
  • Australian Mining
  • Australian Resources & Investment
  • Big Rigs
  • Bulk Handling Review
  • Bus News
  • Cranes & Lifting
  • Earthmoving Equipment Magazine
  • EcoGeneration
  • Energy Today
  • Food & Beverage
  • Fully Loaded
  • Global Trailer
  • Inside Construction
  • Inside Waste
  • Inside Water
  • Landscape Contractor Magazine
  • Manufacturers' Monthly
  • MHD Supply Chain
  • National Collision Repairer
  • OwnerDriver
  • Power Torque
  • Prime Mover Magazine
  • Quarry
  • Roads Online
  • Rail Express
  • Safe To Work
  • The Australian Pipeliner
  • Trade Earthmovers
  • Trade Farm Machinery
  • Trade Plant Equipment
  • Trade Trucks
  • Trade Unique Cars
  • Tradie Magazine
  • Trailer Magazine
  • Trenchless Australasia
  • Waste Management Review

© 2025 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited

No Results
View All Results
NEWSLETTER
SUBSCRIBE
MARKETPLACE
  • News
    • Latest News
    • Contracts and tenders awarded
    • Project Report
  • Features
    • Sustainability
    • Diversity
    • Community Support
    • Technology Update
    • Traffic Management and Safety
  • Events
  • Regions
    • ACT
    • Australia
    • New South Wales
    • Northern Territory
    • Queensland
    • South Australia
    • Tasmania
    • Victoria
    • Western Australia
  • Latest Magazine
  • Resources
  • Marketplace
  • About Us
  • Advertise
  • Subscribe
  • Contact Us
  • List Stock

© 2025 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited