Crews have laid the first 1 kilometre of track for the Forrestfield-Airport link, following the completion of two tunnels in ...
Tunnel Boring Machine (TBM) Sandy has broken through at Bayswater Drive marking the completion of tunnelling on the Forrestfield-Airport Link.
The preferred alliance has been chosen to design and construction the new Bayswater Station to connect major METRONET train lines.
Construction of the new Airport Central Station in Perth has reached 70 per cent completion.
Tunnel Boring Machine (TBM) Grace has broken through at the Bayswater dive structure today making the end of an 8 ...
'Grace' one of the tunnel boring machines for the Forrestfield Airport Link has arrived at Redcliffe Station near Perth Airport.
With tunnel boring machines now clear of Perth Airport's main runway, construction of the Skybridge connecting the airport’s Terminal 1 ...
Works are underway to resolve a leak in tunnel one of the Forrestfield-Airport Link Project in Perth.
Perth’s two tunnel boring machines have reached the Airport Central Station for the Forrestfield-Airport Link.
© 2025 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited
© 2025 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited