• About
  • Advertise
  • Subscribe
  • Contact
  • List Stock
Saturday, January 24, 2026
Newsletter
SUBSCRIBE
MARKETPLACE
  • Latest News
  • Features
    • Sustainability
    • Diversity
    • Community Support
    • Technology Update
    • Traffic Management and Safety
  • Contracts and tenders awarded
  • Regions
    • ACT
    • Australia
    • New South Wales
    • Northern Territory
    • Queensland
    • South Australia
    • Tasmania
    • Victoria
    • Western Australia
  • Events
  • Resources
No Results
View All Results
  • Latest News
  • Features
    • Sustainability
    • Diversity
    • Community Support
    • Technology Update
    • Traffic Management and Safety
  • Contracts and tenders awarded
  • Regions
    • ACT
    • Australia
    • New South Wales
    • Northern Territory
    • Queensland
    • South Australia
    • Tasmania
    • Victoria
    • Western Australia
  • Events
  • Resources
No Results
View All Results
Home support

The economic stimulus of infrastructure spending

by Staff Writer
October 25, 2021
in Industry News, Latest News
Reading Time: 4 mins read
A A
Perth Master Precaster PERMAcast manufactured 54 T-Roff bridge beams for the Mitchell Freeway Extension.

Perth Master Precaster PERMAcast manufactured 54 T-Roff bridge beams for the Mitchell Freeway Extension.

Share on FacebookShare on Twitter
Perth Master Precaster PERMAcast manufactured 54 T-Roff bridge beams for the Mitchell Freeway Extension.

National Precast’s CEO Sarah Bachmann says the boost to infrastructure spend by government is welcomed, but that projects must ensure economic benefit is returned to the local economy.

From materials’ supply to off-site works such as precast concrete manufacture, the impact that infrastructure projects have on long term economic growth is remarkable.

Data by the Australian Bureau of Statistics (ABS) suggests that $1 billion of investment in construction services can stimulate upwards of 5,500 direct and indirect jobs, with a combined value-added national impact estimated at $800 million. It’s why major road, rail and other infrastructure projects are key components of post-COVID fiscal stimulus packages.

The federal government is no stranger to using infrastructure spending to boost economic activity with what is now a more than $100 billion commitment over 10 years. The latest $15.2 billion infrastructure investment that was announced in the 2021 federal budget points to an infrastructure-led recovery and is indicative of the government’s ongoing commitment to the value of infrastructure investment.

According to National Precast’s Chief Executive Officer Sarah Bachmann, the boost to infrastructure spend is welcomed by her organisation’s members, however major infrastructure projects are long term projects and require careful, lengthy planning phases and implementation programmes.

Bachmann says these projects must ensure that the majority of the economic benefit is returned to the local economy and that they must factor in available labour skillsets, materials’ availability and local manufacturing capacity. And importantly, she says they must not take away from resource requirements of ongoing infrastructure repairs and maintenance.

“Major projects represent a medium to long term commitment. The lead time is substantial and if it’s immediate or short-term stimulus that is also a desired outcome, then other types of infrastructure spending should also be considered. Some examples might be social housing, bridge replacement and rail upgrades,” Bachmann comments.

“The last thing we want to be doing in this country is bolstering infrastructure spending, but at the same time driving substantial portions of the economic benefit offshore through foreign contractors. Nor do we want to see a major project absorbing an entire state’s capacity which necessitates the deferral of ongoing repairs and maintenance,” she adds.

Adelaide’s impending 10.5-kilometre Torrens to Darlington Project – the final piece of the North-South Corridor is case in point, set to be the most significant infrastructure project ever undertaken in South Australia.

“The challenge will be how to deliver the required outcomes while utilising local skills and delivering maximum economic benefit to South Australia first and then to the rest of Australia, while not negatively impacting on ongoing infrastructure works.”

Infrastructure stimulus boosts local WA manufacturing

At the height of its activity in 2017, the construction of Perth’s Mitchell Freeway Extension provided employment for more than 250 people. But as with any infrastructure project, its economic boost extended far beyond actual on-site contractors and workers.

Perth Master Precaster PERMAcast manufactured 54 T-Roff bridge beams of varying sizes for the project over a six-month period. At the time, the company invested in a new high-tech 3000-tonne stressing bed.  Managing Director Alberto Ferraro says the project provided work for 25 of his workers during this time.

Master Precaster is a membership category for the National Precast members. Master Precasters are the industry’s best of the best. They are highly regarded by both peers and specifiers. They have a proven track record manufacturing high quality precast in a safe environment. They have a positive impact on the industry and broader community through responsible business practices.

Master Precaster membership members you to have been manufacturing precast for over five years and to meet the requirements of a Master Precaster Membership Audit.

To find a Master Precaster for your next project, visit: www.nationalprecast.com.au.


Related stories:

  • Precasting safer infrastructure with National Precast
  • Masters of precast: Advanced Precast delivers for Coburg Station
  • Online learning on precast now available
Tags: master precasterNational Precastprecastprecast concreteSarah Bachmann
24

$69,000

2016 VOLVO PF2181

  • » Listing Type: Used
Location marker The shape of a location marker

Cranbourne North, VIC

0485 931 103
MORE DETAILS
28

$192,500

2017 CATERPILLAR AP355FLRC

  • » Listing Type: Used
Location marker The shape of a location marker

Acacia Ridge, QLD

07 3171 1725
MORE DETAILS
23

$104,500

2017 CATERPILLAR AP300FLRC

  • » Listing Type: Used
Location marker The shape of a location marker

Acacia Ridge, QLD

07 3171 1725
MORE DETAILS
11

$353,650

2011 TEREX CR352RX

  • » Listing Type: Used
  • » Category: Tyred
  • » Max paving width - mm: 6,100
Location marker The shape of a location marker

Acacia Ridge, QLD

07 3073 8184
MORE DETAILS
9

$159,150

LEEBOY 5000 PATH MASTER PAVER

  • » Listing Type: New
  • » Category: Crawler
  • » Max paving width - mm: 2,720
Location marker The shape of a location marker

Acacia Ridge, QLD

07 3073 8184
MORE DETAILS
12

$143,000

LEEBOY 1200S ASPHALT MAINTAINER

  • » Listing Type: Used
  • » Category: Tyred
  • » Max paving width - mm: 1,600
Location marker The shape of a location marker

Acacia Ridge, QLD

07 3073 8184
MORE DETAILS
24

$270,435

LEEBOY PF161B

  • » Listing Type: Used
  • » Category: Tyred
  • » Max paving width - mm: 3,200
Location marker The shape of a location marker

Acacia Ridge, QLD

07 3073 8184
MORE DETAILS
1

$15,000

BLAW-KNOX BK 170

  • » Listing Type: Used
  • » Category: Tyred
  • » Max paving width - mm: 1,370
Location marker The shape of a location marker

Eltham, VIC

03 8373 7151
MORE DETAILS
13

$507,650

2011 TEREX CR452RX

  • » Listing Type: Used
  • » Category: Tyred
  • » Max paving width - mm: 8,500
Location marker The shape of a location marker

Acacia Ridge, QLD

07 3073 8184
MORE DETAILS
8

$105,000

2007 BLAW-KNOX PF150

  • » Listing Type: Used
  • » Category: Tyred
Location marker The shape of a location marker

Acacia Ridge, QLD

07 3073 8184
MORE DETAILS
12

$202,400

2011 DYNAPAC F1000W

  • » Listing Type: Used
  • » Category: Tyred
  • » Max paving width - mm: 7,925
Location marker The shape of a location marker

Acacia Ridge, QLD

07 3073 8184
MORE DETAILS
5

$110,000

2007 BLAW-KNOX PF150

  • » Listing Type: Used
  • » Category: Tyred
Location marker The shape of a location marker

Acacia Ridge, QLD

07 3073 8184
MORE DETAILS

Related Posts

Construction has commenced on a new replacement bridge for Rainbow Creek, which flows through Cowwarr and Heyfield in regional Victoria.

Works underway on replacement Rainbow Creek Bridge

by Tom O'Keane
January 23, 2026

Construction has commenced on a new replacement bridge for Rainbow Creek, which flows through Cowwarr and Heyfield in regional Victoria....

Over 280 roads will receive funding for upgrades under the 2025-26 Black Spot Program, an annual works package supported by the Federal Government.

More than 280 roads set for upgrades

by Tom O'Keane
January 23, 2026

Over 280 roads will receive funding for upgrades under the 2025-26 Black Spot Program, an annual works package supported by...

The contract for works to deliver the $83.5 million Ballan Road intersection upgrade in Melbourne’s west has been awarded, with the project aiming to improve traffic flow, ease congestion, and make it safer to drive, walk and cycle through the surrounding region.

Two major VIC road intersection projects underway

by Sean Gustini
January 22, 2026

The Victorian Government is moving forward on two critical road intersection projects, with a new contract awarded, and separate works...

Join our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.

Catering to Australia’s civil and road construction industry, Roads & Infrastructure Magazine is a key source for industry decision-makers looking to keep up to date with important issues, developments, projects and innovations shaping the industry today.

Subscribe to our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.

About Roads And Infrastructure

  • About
  • Advertise
  • Subscribe
  • Contact
  • Latest Magazine
  • Terms & Conditions
  • Privacy Collection Notice
  • Privacy Policy

Popular Topics

  • Latest News
  • Contracts and tenders awarded
  • Project Report
  • Events
  • Special Features

Our TraderAds Network

  • Arbor Age
  • Australian Car Mechanic
  • Australian Mining
  • Australian Resources & Investment
  • Big Rigs
  • Bulk Handling Review
  • Bus News
  • Cranes & Lifting
  • Earthmoving Equipment Magazine
  • EcoGeneration
  • Energy Today
  • Food & Beverage
  • Fully Loaded
  • Global Trailer
  • Inside Construction
  • Inside Waste
  • Inside Water
  • Landscape Contractor Magazine
  • Manufacturers' Monthly
  • MHD Supply Chain
  • National Collision Repairer
  • OwnerDriver
  • Power Torque
  • Prime Mover Magazine
  • Quarry
  • Roads Online
  • Rail Express
  • Safe To Work
  • The Australian Pipeliner
  • Trade Earthmovers
  • Trade Farm Machinery
  • Trade Plant Equipment
  • Trade Trucks
  • Trade Unique Cars
  • Tradie Magazine
  • Trailer Magazine
  • Trenchless Australasia
  • Waste Management Review

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited

No Results
View All Results
NEWSLETTER
SUBSCRIBE
MARKETPLACE
  • News
    • Latest News
    • Contracts and tenders awarded
    • Project Report
  • Features
    • Sustainability
    • Diversity
    • Community Support
    • Technology Update
    • Traffic Management and Safety
  • Events
  • Regions
    • ACT
    • Australia
    • New South Wales
    • Northern Territory
    • Queensland
    • South Australia
    • Tasmania
    • Victoria
    • Western Australia
  • Latest Magazine
  • Resources
  • Marketplace
  • About Us
  • Advertise
  • Subscribe
  • Contact Us
  • List Stock

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited