• About
  • Advertise
  • Subscribe
  • Contact
  • List Stock
Friday, January 23, 2026
Newsletter
SUBSCRIBE
MARKETPLACE
  • Latest News
  • Features
    • Sustainability
    • Diversity
    • Community Support
    • Technology Update
    • Traffic Management and Safety
  • Contracts and tenders awarded
  • Regions
    • ACT
    • Australia
    • New South Wales
    • Northern Territory
    • Queensland
    • South Australia
    • Tasmania
    • Victoria
    • Western Australia
  • Events
  • Resources
No Results
View All Results
  • Latest News
  • Features
    • Sustainability
    • Diversity
    • Community Support
    • Technology Update
    • Traffic Management and Safety
  • Contracts and tenders awarded
  • Regions
    • ACT
    • Australia
    • New South Wales
    • Northern Territory
    • Queensland
    • South Australia
    • Tasmania
    • Victoria
    • Western Australia
  • Events
  • Resources
No Results
View All Results
Home

The Tuen Mun–Chek Lap Kok tunnel – One of the world’s mega-TBM projects

by Staff Writer
September 21, 2016
in Civil Works, Events, Industry News, Latest News, Project Report
Reading Time: 6 mins read
A A
Seved Robin, who is responsible for the delivery team for the Tuen Mun–Chek Lap Kok tunnel, talks about the innovative tunnelling project ahead of the 14th Australian Tunnelling Conference.
Share on FacebookShare on Twitter

Seved Robin, who is responsible for the delivery team for the Tuen Mun–Chek Lap Kok tunnel, talks about the innovative tunnelling project ahead of the 14th Australian Tunnelling Conference.The Tuen Mun–Chek Lap Kok tunnel will link the New Territories, north of Hong Kong to Lantau Island, where the international airport is located. Dragages Hong Kong, a Bouygues Construction subsidiary was awarded the project, consisting of the construction of a submersed twin-tube tunnel, each 14m in diameter and carrying two lanes of traffic.

Seved Robin, who is responsible for the delivery team for this innovative project, talks about the development, ahead of the 14th Australian Tunnelling Conference.

Could you give us a brief overview of the project and the stage that the project is currently at?

SR: The first phase of the project, a 16.5ha sea reclamation, was completed at the northern end of the project in late 2014.  In 2015, 0.7km of twin TBM tunnels with a diameter of 14m and sitting 17.6m below the reclamation was completed.

All facilities for the sub-sea TBM tunnel drives have been set up on the reclaimed land. This includes construction of a peanut shaped TBM launch shaft, a 60m diameter 45m deep ventilation shaft, and approach tunnels under the reclamation.  The TBM’s drive of 4km for the twin sub-sea tunnel section commenced in December 2015 and April 2016 respectively. The tunnel section in rock has been excavated with most of the remaining drives in soft ground. With the tunnel depth around 50m below sea level at axis, we use the saturation technique for changing the cutting tools of the TBM cutter heads in hyperbaric conditions. So far, ground conditions have generally required daily interventions. We started eight months ago and we’re now at our 15th team of hyperbaric workers in saturation cycle.

Construction of the cross passages commenced at the beginning of 2016. Seven have been completed out of a total of 56 with four completed by the TBM (a total of 44 will be completed using this method). With the majority of cross passages still to be created, there are a number of major technical risks ahead that need to be managed effectively to maintain safe excavation at 5 bar pressure and ensure water tightness.

The project has drawn global attention, given its status as one of the world’s mega-TBM projects – what are the unique conditions or features of working with a TBM of this scale?

SR: The ground conditions in the tunnel alignment are highly variable and the water pressure is high – up to 6 bars. The first half of the tunnel drive is predominantly in rock and mixed ground including reclamation fill, marine deposit, weathered rock and granite. The second half is in soft alluvium.

We’re using mix shield slurry TBMs due to the mixed ground conditions which require regular cutter head maintenance. The cutter heads used have a diameter of 14m with 98 disc cutters each. In completely decomposed granite (CDG) we change 5-10 disc cutters per day to keep the cutter head in good condition. The larger the diameter, the more maintenance is required. The cutter head on the 17.6m diameter TBM used on the northern tunnel last year had 125 disc cutters, requiring even more maintenance per lm of tunnel.

With large diameter TBMs, the ring build is also more difficult as the segments are so large it is hard for the operator to see all contact zones simultaneously during installation. Large TBMs also increase the need for additional care as hard rock torque can increase suddenly and cause severe damage.

What innovative technologies or approaches have been used during the design and construction phases? What advantages have they brought to the project?

SR: The project has already seen a number of innovations created for increased safety and productivity. Three innovations developed by the Bouygues Construction Research & Development Department to reduce manual operations in hyperbaric conditions include:

Mobydic – A sensor system built into the disc cutters allows on-going monitoring of the cutters’ wear and allows real-time geological mapping of the rock face without human intervention under pressure.

Snake – A remotely controlled exploration arm equipped with a high-pressure jet to clean the TBM head. Snake eliminates clogging and provides CCTV images increasing safety, productivity and efficiency.

Telemac – a remotely controlled robotic arm located behind the TBM cutter head that replaces disc cutters and eliminates the need for workers to enter the hazardous excavation chamber. In January 2016, the first fully automated disc cutter change took place. Telemac has since been used on both TBMs in the subsea tunnel with specialised disc cutters developed to further ease the difficulty in changing disc cutters.

Saturation diving has also been introduced on this project, minimising the exposure of frequent pressure change which can cause hyperbaric trauma especially when intervention pressures are over 3.5 bars. It is the first time saturation diving has been used on TBMs in an industrial manner for long periods. Specific diving procedures were imported from the oil and gas industry and adapted for the specifics of this project. Gas mixes, equipment, storage pressures and excursion steps have been designed to mitigate health risks and fit with the working pressures and programmes of the twin tunnel excavation.

Construction of the cross passages by pipe jacking slurry TBM method was developed to mitigate ground conditions and programme risks. The fact that there are 56 cross passages on the project, with 41 in the subsea section, made it imperative to select the most risk adverse technique.

Can you tell us about any unforeseen challenges that the team has overcome to ensure the project is moving forward as planned?

SR: The catalyst to use slurry TBM pipe jacking methods to construct the cross passages came from the borehole and freezing tests completed on samples from the cross passage positions. These revealed high clay content with much lower strength than expected. This meant an increase in the thickness of the ice ring required and thus an increase in risk of the ground freezing methods intended.

We had to find a mechanical solution to construct the cross passages that would be less sensitive to ground conditions and which would provide better certainty in terms of water tightness and programme.

Can you share an interesting fact about the project with us?

SR: In October 2014 we had to decide on a TBM design and have it manufactured within 12 months to be delivered to the reclamation site by December 2015.

The north approach ramp, which constitutes the first 700m of the tunnels, was to be constructed in one kilometre reclamation built at the beginning of the contract. The depth was 20-45m below reclamation level, so we had to look at using traditional cut and cover or bored tunnels using a TBM. Both solutions had pros and cons but we finally chose the bored tunnel option with approval from the project owner. This would require a larger diameter TBM of around 18m which would be the largest diameter ever used.  The reclamation had not yet begun and we had no land, only sea water. It was a crazy challenge but it is instances like these that make tunnelling so exciting right?!

Which projects are you looking forward to hearing about and what discussions are you looking forward to having with your peers at the 14th Australian Tunnelling Conference?

SR: The conference programme looks really interesting overall, but personally I’m looking forward to hearing about the latest updates on the Melbourne and Sydney Metro projects.

The main questions I’ll have about upcoming projects will be around the techniques that can add value and better cater for ground conditions, depth, access difficulties and programme challenges.

28

$192,500

2017 CATERPILLAR AP355FLRC

  • » Listing Type: Used
Location marker The shape of a location marker

Acacia Ridge, QLD

07 3171 1725
MORE DETAILS
24

$69,000

2016 VOLVO PF2181

  • » Listing Type: Used
Location marker The shape of a location marker

Cranbourne North, VIC

0485 931 103
MORE DETAILS
23

$104,500

2017 CATERPILLAR AP300FLRC

  • » Listing Type: Used
Location marker The shape of a location marker

Acacia Ridge, QLD

07 3171 1725
MORE DETAILS
6

$304,220

2008 TEREX CR662RM

  • » Listing Type: Used
  • » Category: Crawler
Location marker The shape of a location marker

Acacia Ridge, QLD

07 3073 8184
MORE DETAILS
24

$270,435

LEEBOY PF161B

  • » Listing Type: Used
  • » Category: Tyred
  • » Max paving width - mm: 3,200
Location marker The shape of a location marker

Acacia Ridge, QLD

07 3073 8184
MORE DETAILS
9

$159,150

LEEBOY 5000 PATH MASTER PAVER

  • » Listing Type: New
  • » Category: Crawler
  • » Max paving width - mm: 2,720
Location marker The shape of a location marker

Acacia Ridge, QLD

07 3073 8184
MORE DETAILS
11

$353,650

2011 TEREX CR352RX

  • » Listing Type: Used
  • » Category: Tyred
  • » Max paving width - mm: 6,100
Location marker The shape of a location marker

Acacia Ridge, QLD

07 3073 8184
MORE DETAILS
12

$143,000

LEEBOY 1200S ASPHALT MAINTAINER

  • » Listing Type: Used
  • » Category: Tyred
  • » Max paving width - mm: 1,600
Location marker The shape of a location marker

Acacia Ridge, QLD

07 3073 8184
MORE DETAILS
13

$507,650

2011 TEREX CR452RX

  • » Listing Type: Used
  • » Category: Tyred
  • » Max paving width - mm: 8,500
Location marker The shape of a location marker

Acacia Ridge, QLD

07 3073 8184
MORE DETAILS
8

$105,000

2007 BLAW-KNOX PF150

  • » Listing Type: Used
  • » Category: Tyred
Location marker The shape of a location marker

Acacia Ridge, QLD

07 3073 8184
MORE DETAILS
4

$8,000

1974 BLAW-KNOX BK-20

  • » Listing Type: Used
  • » Category: Tyred
  • » Max paving width - mm: 2,440
Location marker The shape of a location marker

Eltham, VIC

03 8373 7151
MORE DETAILS
5

$110,000

2007 BLAW-KNOX PF150

  • » Listing Type: Used
  • » Category: Tyred
Location marker The shape of a location marker

Acacia Ridge, QLD

07 3073 8184
MORE DETAILS

Related Posts

The contract for works to deliver the $83.5 million Ballan Road intersection upgrade in Melbourne’s west has been awarded, with the project aiming to improve traffic flow, ease congestion, and make it safer to drive, walk and cycle through the surrounding region.

Two major VIC road intersection projects underway

by Sean Gustini
January 22, 2026

The Victorian Government is moving forward on two critical road intersection projects, with a new contract awarded, and separate works...

The Worley Arcadis Joint Venture (JV) has been awarded the contract to deliver marine technical advisory services, which will be essential in the delivery of Westport, in Western Australia.

Contract awarded for Westport infrastructure works

by Tom O'Keane
January 22, 2026

The Worley Arcadis Joint Venture (JV) has been awarded the contract to deliver marine technical advisory services, which will be...

The Federal and Victorian governments have come together to improve the safety of a busy intersection in Melbourne’s Dandenong North for pedestrians and cyclists.

Stud Road intersection safety works complete

by Sean Gustini
January 21, 2026

The Federal and Victorian governments have come together to improve the safety of a busy intersection in Melbourne’s Dandenong North...

Join our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.

Catering to Australia’s civil and road construction industry, Roads & Infrastructure Magazine is a key source for industry decision-makers looking to keep up to date with important issues, developments, projects and innovations shaping the industry today.

Subscribe to our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.

About Roads And Infrastructure

  • About
  • Advertise
  • Subscribe
  • Contact
  • Latest Magazine
  • Terms & Conditions
  • Privacy Collection Notice
  • Privacy Policy

Popular Topics

  • Latest News
  • Contracts and tenders awarded
  • Project Report
  • Events
  • Special Features

Our TraderAds Network

  • Arbor Age
  • Australian Car Mechanic
  • Australian Mining
  • Australian Resources & Investment
  • Big Rigs
  • Bulk Handling Review
  • Bus News
  • Cranes & Lifting
  • Earthmoving Equipment Magazine
  • EcoGeneration
  • Energy Today
  • Food & Beverage
  • Fully Loaded
  • Global Trailer
  • Inside Construction
  • Inside Waste
  • Inside Water
  • Landscape Contractor Magazine
  • Manufacturers' Monthly
  • MHD Supply Chain
  • National Collision Repairer
  • OwnerDriver
  • Power Torque
  • Prime Mover Magazine
  • Quarry
  • Roads Online
  • Rail Express
  • Safe To Work
  • The Australian Pipeliner
  • Trade Earthmovers
  • Trade Farm Machinery
  • Trade Plant Equipment
  • Trade Trucks
  • Trade Unique Cars
  • Tradie Magazine
  • Trailer Magazine
  • Trenchless Australasia
  • Waste Management Review

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited

No Results
View All Results
NEWSLETTER
SUBSCRIBE
MARKETPLACE
  • News
    • Latest News
    • Contracts and tenders awarded
    • Project Report
  • Features
    • Sustainability
    • Diversity
    • Community Support
    • Technology Update
    • Traffic Management and Safety
  • Events
  • Regions
    • ACT
    • Australia
    • New South Wales
    • Northern Territory
    • Queensland
    • South Australia
    • Tasmania
    • Victoria
    • Western Australia
  • Latest Magazine
  • Resources
  • Marketplace
  • About Us
  • Advertise
  • Subscribe
  • Contact Us
  • List Stock

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited